Upgrade A10 Control

Upgrading A10 Control ensures access to the latest features, enhancements, and fixes.

Before starting the upgrade, review all prerequisites and confirm cluster health, backups, and license requirements. For any assistance with the upgrade steps, contact the A10 Networks Support.

Supported Upgrade Path

The following upgrade paths are supported:

Current Version Target Version

A10 Control 1.4.0

A10 Control 1.5.0

A10 Control 1.5.1

NOTE: A10 Control does not support changing between IPv4 and IPv6 during an upgrade.

Key Considerations

NOTE: Security feature is added for changing the default super-admin SSH password upon first login. You must SSH as super-admin user in all 3 nodes at least once and change the default password before upgrading the Multi-node setup from 1.4 to higher version.

Upgrade Workflow

To upgrade an A10 Control instance, perform the following:

  1. Verify prerequisites.

    • Confirm registered ACOS Thunder devices are compatible with the target A10 Control version. For more information, see A10 Control Compatibility Matrix .
    • Take a complete backup. For more information, see Backup and Restore .
    • Ensure sufficient disk space on the A10 Control master node.

      The requirement is: 150 GB + 5% of the root partition size.

      To verify available disk space, run the following command:

      $ df -h /

      If the available space is below this threshold, free up space or add storage before proceeding.

  2. Download the upgrade package. For more information, see Download the Upgrade File.
  3. Upgrade and verify.

    1. Run the upgrade command on the master node.

    2. Monitor the upgrade progress.

    3. Reboot all the nodes from GUI.

    4. After completion, verify that the upgrade was successful.

    For more information, see Upgrade Procedure .

COMPANY INFORMATION: Copyright © 2026 A10 Networks, Inc. All Rights Reserved. Legal Notice